Decommissioning of Fluid Bed Processor - removal, decontamination and sale of machine and ancillary equipment.
   
• Decommissioning two Pan Coaters - removal, cleaning of machine, primary and secondary air handling equipment and ancillaries and shipment to Italy.
   
• Installation of Fluid Bed Dryer with Solvent Recovery System - liaising with manufacturer’s engineering and design team and client project team, to commissioning, process trials and handover.
   
• Installation of Pan Coater and all ancillary equipment - through to commissioning, including validation.
   
• Installation of IBC wash station in new facility - through commissioning with vendor to hand over.
   
• Installation of a Wash In Place system - full integration to existing equipment.
   
• Upgrade of two IBC wash stations in existing facility to incorporate DI rinse cycle - including certification and passivation.
   
• Technical consultant to EHS department regarding upgrade of current dust collection system in order for all equipment to comply with current ATEX standards.
   
• Design, construction and installation of cleanroom in existing powder handling unit.
   
• Relocation & Retro-fit of existing hoist to suit clients new requirements.
   
• Polishing of a filter/dryer to 0.5ra including surface testing certification and passivation.
   
• Upgrade of mechanical winch system on Fluid Bed Dryer to comply with health and safety regulations.
   
• Technical consultant - regarding room upgrades in order to bring the existing rooms in the facility up to cGMP standards.